logo Weezblog

Se connecter S'inscrire
total : 205
aujourd'hui : 7
Articles
The title suit of the Ayodhya land dispute case is pending before the Supreme Court.. In January, the court is expected to announce a date for the beginning of the hearing. The country wants ‘Ram rajya’. They are aware of the sentiments.The campaign will culminate at Prayag with a ‘Dharam Sansad’ of priests and saints. It said no traffic will be allowed on Ranjeet Singh Flyover (from Guru Nanak Chowk to Barakhambha Road), JLN Marg (from Rajghat to Delhi Gate), Chaman Lal Marg near VIP gate."Thousands of people gathered at Ramlila Maidan for the Vishwa Hindu Parishad rally, which comes ahead of Parliament’s winter session commencing Tuesday.

But as the dispute has remained unresolved for more than 25 years, right-wing groups are demanding that the Union government sidestep the courts and go ahead with the temple building. In the forthcoming stage, it will hold religious rituals and prayers at temples and matths." Without naming Gate opener manufacturers the BJP, Joshi added, "We are not begging for it.New Delhi: Senior RSS leader Suresh ‘Bhaiyyaji’ Joshi on Sunday made a veiled attack on the BJP for not fulfilling its promise of constructing a Ram temple in Ayodhya and demanded that the Union government enact a legislation, if need be, for it."It is a massive gathering which will change the hearts of all those who are not in favour of bringing the bill for construction of a grand Ram Temple in Ayodhya," VHP’s spokesperson Vinod Bansal said. VHP president Vishnu Sadashiv Kokje and its international working president Alok Kumar are also expected to address the rally. The VHP had carried out a door-to-door campaign to make the rally a success. They should listen to people and fulfil the demand of temple in Ayodhya.Elaborate security arrangements have been made at Ramlila Maidan and snipers have been deployed on high-rises.Traffic police have issued an advisory detailing diversions in view of the rally. The final religious congregation will be held on January 31 and February 1. We are expressing our emotions.Speaking at a VHP rally at Ramlila Maidan  in Delhi, the RSS executive head said, "Those in power today had promised to construct a Ram temple.The right-wing group had approached President Ram Nath Kovind and state governors during previous phases of its temple campaign

Posté le 14/12/2021 à 03:38 par swingg

0 commentaire : Ajouter
They ventured into the most remote corners of the affected areas rescuing people.48 crores. The damage due to this deluge is approximately estimated at Rs.Kerala said it had raised the issue regarding operational flexibility of water release from the dam as early as in 2014, in the Supervisory Committee meetings and Tamil Nadu Government was directed to prepare a Gate Operation Schedule in this regard, fully taking into account flash floods in the downstream areas.Consequently Kerala suggested that the gradual releases should start when the water level reaches 136 feet itself, so that there should be at least 1.

On the overall flood situation, the Kerala Chief Secretary said the deluge faced by the State of Kerala is unprecedented in its recent history. This deluge directly affected more than 54 lakhs, one sixth of the population. The state has evacuated more than 12. Kerala said with a view to having sufficient flexibility of operation during moderate to high floods, it is imperative that Mullaperiyar reservoir should have enough maneuverability. Mullaperiyar therefore is exceptionally vulnerable because it has a large catchment area and limited storage capacity when compared to Idukki, which has a four times the storage capacity with almost similar catchment area. 4100 Fire and Rescue Services personnel were engaged and they operated 69 Rubber Boats.543 TMC (Gross Capacity being 70.On the steps taken as flood relief, Government of Kerala sought immediate assistance of the armed forces and deployment of the National Disaster Response Force (NDRF) from the Union Government to address rescue and relief operations keeping in mind colossal magnitude of the flood spanning 13 of the 14 districts Wholesale Barrier Factory in the State.New Delhi: Ahead of the Friday hearing the Kerala government informed the Supreme Court on Thursday that despite addressing the need for maintaining the water level at 139 ft in Mullaperiyar dam to avoid floods, there was no positive assurance from Tamil Nadu authorities for this request.

It said with a view to avoiding a repeat of such situations, State of Kerala wanted that the Chairman, Central Water Commission with Secretaries of both States as members, head the Supervisory Committee..Air Force provided 22 helicopters and 23 fixed 3 wing aircrafts, BSF provided 2 companies with one water vehicle team and10 teams of CRPF were deployed. Over and above this about 1,400 fishermen from coastal villages of Kerala rushed to the affected villages with their 600-odd country vessels.It said that Central forces are presently deployed in addition to a large contingent of State Police, Fire and Rescue Personnel and the entire contingent of State Disaster Response Force (SDRF).In addition to this, the entire State machinery was galvanised to manage the disaster. He said this forced Kerala to release more water from the Idukki reservoir, downstream of Mullaperiyar, which is one of the causes of this deluge. Odisha fire services provided 244 Firemen and 63 Rubber Boats.758 TMC. It has already surpassed the devastation caused by the 1924 flood, it is now considered the most intense flood to have hit the State in the last 100 years.

Posté le 18/11/2021 à 04:23 par swingg

0 commentaire : Ajouter
According to a senior Railway Protection Force (RPF) officer, Naidu had boarded the train and fallen off while the train was leaving from Diva station. 2, making him lose grip and fall off. She was going to CSMT for her catering job. But she fell near the LC gate and was taken first Jivadani Hospital.50 am.The reason for her falling may be overcrowding or she may have lost her balance. "We have registered a case of accident," Shirtode added. On January 22, 2018, Marathi film actor Praful Bhalerao (22), who died, was supposedly leaning from the footboard of a local train when it started gaining speed on its way out of Malad platform no.Naidu, who was onboard a ladies coach, fell onto the tracks near a level-crossing gate after the train had left platform number four of the Diva railway station at around 7. The Railways is fraught with such incidents. Senior police inspector of Thane GRP station, Rajendra Shirtode, said that Lata Naidu boarded the Kasara-CSMT bound train from platform number 4 of Diva station.MUMBAI: A 35-year-old catering firm woman employee, Lata Gangadhar Naidu, fell off Wholesale Barrier a CSMT-bound fast train in Diva on Thursday morning allegedly after losing her balance, after which her left leg got crushed when it came under the wheels.The woman was first hospitalised at Jivadani Hospital and later she was shifted to Mamata Hospital in Dombivali for treatment. She was rushed to a hospital where her left leg had to be amputated by doctors.The incident took place at 7. Thane government railway police (GRP) has registered a case of accident..He further added that as per her statement she had lost her balance.A senior CR officer said that if Lata were a bonafide passenger, then she would be given a compensation of Rs 25,000.Previous incidentsOn April 11, 2018, Ranjnish Singh (25), who was a sales executive, died after falling from overcrowded train between Diva and Kopari

Posté le 18/11/2021 à 04:02 par swingg

0 commentaire : Ajouter
About 6 lakh passengers visit the New Delhi station daily. The cost of the upcoming skywalk will be around Rs 9 crore."The  upcoming skywalk will ease the pressure on our entry/exit points and provide us  more volume in terms of passengers," said a DMRC official on the condition of anonymity. The DMRC (Delhi Metro Rail Corporation) has floated a tender in this regard recently.15 am in the morning till 11.30 pm late in the night. "At present, passengers are facing miserable traffic conditions while trying to enter the New Delhi station. It, however, has its own set of issues, one of them being the pillars. sliding door openersIn a bid to provide hassle-free walk between New Delhi Metro station and New Delhi Railway Station at the Ajmeri Gate side, the Delhi Metro is all set to construct a skywalk to connect them. The choice was reportedly between a skywalk and a tunnel, of which the former was shortlisted.The DMRC will bear the entire cost of the skywalk.The Airport Express is India’s only dedicated high speed Metro connection between the city and the airport.Earlier, a skywalk was not the automatic choice to connect the railway station with the Metro station. For the convenience of passengers, travelators will be installed on the skywalk so that they can be transported between the two stations without walking," said a DMRC official. These will be constructed on the road and may impede traffic flow.The skywalk, enabled with escalators, will connect the railway station to the exits of the Delhi Metro station and Airport Metro Line. It is suited for the transportation of cargo since there is a separate coach for luggage and services are available all through the day from 5..The Airport Metro Line originates at the New Delhi station, which is more than 200 metres away from the Ajmeri Gate end of the railway station

Posté le 28/10/2021 à 08:09 par swingg

0 commentaire : Ajouter

1-2